Roughly 12 months after it was first conceptualized, construction for the Village of Minooka’s Aux Sable Springs Park is now underway. Led by Upland Design, the park design includes three baseball fields, two soccer fields, a lacrosse field, a playground, new parking areas, a native detention basin, 6,600 feet of trails, and a fishing outcropping. Shown here is the new access and canoe launch to Aux Sable Creek.
0 Comments
A beautiful day for construction at the Rudzinski Park Redevelopment for the Rantoul Recreation Department! New walking paths are currently being installed along with an expanded parking area, a variety of fitness equipment, playgrounds, and two new picnic shelters. This project is being financed with funds from the IDNR OSLAD grant program and will provide an exciting, much needed area for gathering and play in this area of town. Construction is expected to be finished by the end of this summer.
ERA provided land surveying, civil engineering, entitlement, and construction phase services for the Tiny Boardwalk Shops located in downtown Batavia, IL. The shops are a small business incubator development in partnership with Batavia MainStreet and the City of Batavia. According to The Batavia Boardwalk Shops Facebook page, “this program is designed to attract small businesses, create more retail shopping, and bring people into Downtown Batavia for both this unique destination and the rest of our downtown.”
|
ERA ConsultantsEngineering Resource Associates, Inc. (ERA) is a consulting firm providing civil engineering, structural engineering, environmental science, and surveying. Archives
January 2023
Categories
All
|