Lake County Division of Transportation
|
ERA is providing Phase I and II engineering services for the replacement of the Hart Road Bridge over Flint Creek with a single-span PPC I-Girder superstructure bridge on integral abutments (SN 049-3077) using local funds. The entire bridge is located within the floodplain and the east side is within the floodway. The phase I engineering included a Bridge Condition Report (BCR), Hydraulic Report, Wetland Delineation and Environmental Assessments, and public coordination. Phase II engineering included utility coordination, permitting, Plats & Legals, design plans, specifications, cost estimates and time of construction. The project also included coordination with the Village of Barrington to widen the bridge to accommodate a future bike path on the east side for the high school. The structural design also included various railing elements and concrete treatments to produce a functional and aesthetically pleasing structure for the community.
|