Lake County Division of Transportation
|
ERA will be providing Phase I and II engineering services for the replacement of the Hart Road Bridge over Flint Creek with a single-span bridge (SN 049-3077). The entire bridge is located within the floodplain and the east side is within the floodway. The phase I engineering will include a Bridge Condition Report (BCR), Hydraulic Report, Wetland Delineation and Environmental Assessments, and public coordination. Options to be considered are slab bridge, PPC beck beam bridge and PPC in girder bridge. Phase II engineering will include utility coordination, permitting, Plats & Legals, design plans, specifications, cost estimates and time of construction. The project also includes coordination with the City of Barrington to widen the bridge to accommodate a bike path for the High School on the east side. The project is locally funded.
|