Engineering Resource Associates
  • Home
  • About
    • Our Firm
    • Our History
    • Meet the Team
    • Prequalification
    • Professional Affiliations
    • 2024 Year in Review
  • Services
    • Transportation
    • Municipal
    • Structural
    • Water Resources
    • Site Development
    • Environmental
    • Parks & Recreation
    • Construction
    • Surveying
    • Forensic Investigations
    • Geographic Information Systems - GIS
    • Online Public Surveys
  • Careers
    • Careers at ERA
    • Internships
  • Contact
    • Contact Us
    • Locations
    • Request a Quote
  • Client Access
  • Employee Login
Picture
Picture
Picture
ERA provided Phase I and Phase II engineering for the reconstruction of Schoenbeck Road from US 12 to W. Camp McDonald Road using federal funds. The project also included a new sidewalk on the west side of the project limits, a retaining wall, and intersection upgrades for the pedestrian crossings at both intersections. Phase I engineering includes a Project Development Report (PDR), Environmental Survey Request (ESR), public information meeting, Crash Analysis, Traffic capacity Analysis, Intersection Design Study, utility coordination, IDOT coordination and a traffic management plan for staging on US 12. Phase II consisted of contract documents including Plans, Specifications, and Estimates (PS&E) for an IDOT letting. 
Picture
Picture

WARRENVILLE

3S701 West Avenue
Suite 150
Warrenville, IL 60555

Phone:
​630.393.3060


CHAMPAIGN

2416 Galen Drive
Champaign, IL 61821

Phone:
​217.351.6268


CHICAGO

10 S. Riverside Plaza
Suite 875

Chicago, IL 60606

Phone:
​312.470.6044


MILWAUKEE

342 N. Water Street
Suite 600
​Milwaukee, WI 53202

Phone:
​ 414.238.9189


Picture
Picture
Picture
Picture
Picture
Picture
Office Hours: 8:00 am - 5:00 pm