Engineering Resource Associates
  • Home
  • About
    • Our Firm
    • Our History
    • Meet the Team
    • Prequalification
    • Professional Affiliations
    • 2024 Year in Review
  • Services
    • Transportation
    • Municipal
    • Structural
    • Water Resources
    • Site Development
    • Environmental
    • Parks & Recreation
    • Construction
    • Surveying
    • Forensic Investigations
    • Geographic Information Systems - GIS
    • Online Public Surveys
  • Careers
  • Contact
    • Contact Us
    • Locations
    • Request a Quote
  • Client Access
  • Employee Login
Picture
Picture
Picture
ERA was retained to prepare plans and specifications for the resurfacing of Parking Lot A, on the College of DuPage Campus, which serves both the Culinary and Hospitality Center, and the Harold D. McAninch Arts Center on the Glen Ellyn Campus.  This parking lot holds at total of 433 parking spaces of which 14 are handicap parking and is the access point to the loading docks for the food service for the campus.  Work included surveying of all the handicap ramps to ensure compliance with ADA regulations. Several areas had the access points reconstructed to meet current regulations. Plans and specifications were prepared, and ERA assisted with bidding. ERA staff also performed construction oversight, which included coordination with the College users and operations personnel to limit disruptions.  
Picture
Picture

WARRENVILLE

3S701 West Avenue
Suite 150
Warrenville, IL 60555

Phone:
​630.393.3060


CHAMPAIGN

2416 Galen Drive
Champaign, IL 61821

Phone:
​217.351.6268


CHICAGO

10 S. Riverside Plaza
Suite 875

Chicago, IL 60606

Phone:
​312.470.6044


MILWAUKEE

342 N. Water Street
Suite 600
​Milwaukee, WI 53202

Phone:
​ 414.238.9189


Picture
Picture
Picture
Picture
Picture
Picture
Office Hours: 8:00 am - 5:00 pm