ERA provided Phase II and III Engineering Services for the Weber/Waverly Park Water Main Replacement project. The existing water system that serve the residents in these areas have exceeded its useful service life and the City will install new water main along sections of roadway within the Waverly Park subdivision and Weber Drive in advance of street resurfacing. The scope of work included the engineering for the installation of approximately 7,800 feet of 8-inch and 10-inch ductile iron water main and water service replacements within the neighborhood. Extensive coordination was required with the Village of Arlington Heights since the east half of Weber Drive is under their jurisdiction.
|